Prime or paint.

Two finishes for the same restoration. Your call, project by project.

Scope of works

Prime exposed timber is item 12 of 14.

Included in Restoration and Double-glazing retrofit.

No. Scope item Restoration Double-glazing retrofit
01 Repair rot — wood-hardener treatment and spliced inlays
02 Unblock painted-shut sashes
03 Service pulleys, hinges and locks
04 Replace sash cords
05 Fix loose joints — reinforce window frames
06 Repair cracked glass
07 Draught-proofing Optional
08 Remove single glazing
09 Rebate sashes and frames for VIG glazing
10 Install vacuum-insulated glazing
11 Add weights to counterbalance heavier glazing
12 Prime exposed timber — this page
13 Ironmongery — install new lifts, fasteners, locks and handles on request
14 Remove rubbish on completion
See the interactive scope sheet →

Every restored window leaves us primed — that is part of the standard scope. From there, two routes: hand the window back at primer for decoration later, or take it through to a finished topcoat in the workshop. Both are services we offer. Pick what fits the project.

Prime

Surfaces are stripped, prepared, and sealed with primer. The final colour is the primer's own — usually white or grey. No further coats are applied; the window is functional, weather-tight, and ready for paint at any future date.

The right call when:

Paint

After priming, topcoats are built up layer-on-layer using spray application. Finishes are smooth, even, and harder-wearing than brushwork alone. Colour-match options are extensive; microporous systems are used where breathability matters — which on old timber windows, it usually does.

The right call when:

A finished sash window after primer and topcoats — smooth, even, hard-wearing.